^ZULU Code The Wikipedia of Ship Machinery

Maintenance Schedule — PB0501DS16

^Z S E M M

← Back to ^CABP — PB0501DS16

Maintenance Schedule

JobIntervalTypeSource
Boiler — F.O. cut-off (low-low water level) trip: test 3 months test Maker
Boiler — boiler water: measure chemical concentration and check water quality 1 days analyse Maker
Boiler — reflex water level gauge: blow through and check response 1 days check Maker
Boiler — remote water level indicator: compare with gauge glass 6 months test Maker
Boiler — steam and water leakage: check pressure parts, flanges and valves 1 days inspect Maker
Boiler — water level alarm: test 2 weeks test Maker
Burner — flame eye: flame-failure test 6 months test Maker
Dosing pump — change diaphragm 10,000 h replace Maker
Dosing pump — change hydraulic oil 5,000 h replace Maker
F.D. fan — inlet damper actuator: check pin, key and manual handle 3 months check Maker
Feed water control valve — overhaul diaphragm, sliding parts and O-rings 1 years overhaul Maker
Feed water control valve — static test, inspect valve disc and seat 6 months inspect Maker

Information received from various sources and contributors.