JobIntervalTypeSource
Air leakage - check 1 days check Maker
Air purification (discharge) filter cartridge - change (half-yearly) 6 months replace Maker
Compressor - clean and check assembly condition 1 days clean Maker
Condensate drain valve - check 1 days check Maker
Crankcase oil - change 50 h replace Maker
Crankcase oil - change (half-yearly) 6 months replace Maker
Crankcase oil level - check 1 days check Maker
Oil filter element - check/change 3 months replace Maker
Oil/water separator - check 6 months inspect Maker
Oil/water separator - clean 1 years clean Maker
Piston rings - check 2 years inspect Maker
Pressure gauges - check 1 days check Maker
Pressure switch - check 1 weeks check Maker
Safety valves - check 1 months check Maker
Stage valves - replace 1,000 h replace Maker
Suction and discharge valves - check 3 months inspect Maker
Suction filter - clean 1 weeks clean Maker
Suction filter element - change 3 months replace Maker
V-belt tension - check 1 months check Maker
V-belts - replace after first 25 h 25 h initial Maker