JobIntervalTypeSource
Bulkhead stuffing box - renew gas-tight oil seal 5 years replace Maker
Gear couplings - add/change grease (running-hour limit) 4,000 h lubricate Maker
Gear couplings - first grease renewal after initial operation 3 months initial Maker
Gear couplings - renew grease 6 months lubricate Maker
Motor - check for irregular noise and excessive vibration 1 days check Maker
Motor - check shaft sealing rubber ring for deterioration 24 months inspect Maker
Motor - first inspection (all B items) 6 months initial Maker
Motor - measure and record bearing temperature 1 days check Maker
Motor - record winding temperature detectors 1 days check Maker
Motor enclosure - check ventilation, gaskets, damage, noise-suppression material, clearances, corrosion 24 months inspect Maker
Motor enclosure - clean external cooling air paths, clean/replace air filter 24 months clean Maker
Motor enclosure - drain condensate plug, check earthing terminals 24 months check Maker
Motor fan - check external and internal fan for damage or corrosion 24 months inspect Maker
Motor monitoring instruments - function check 24 months test Maker
Motor shaft and coupling - check alignment, coupling bolts, keys, balancing weight, gear-coupling leakage 24 months check Maker
Motor squirrel-cage rotor - inspect cage bars, end rings, axial displacement 24 months inspect Maker
Motor stator winding - inspect slot wedges, insulation, bracing 24 months inspect Maker
Motor stator winding - measure and record insulation resistance 24 months test Maker
Motor stator winding and rotor - clean 24 months clean Maker
Motor terminal box - check ingress, connections and insulators 24 months inspect Maker
Pump & intermediate shaft bearings, bulkhead stuffing box - renew grease 1 years lubricate Maker