| Data logger - back up logging data |
1 weeks |
service |
Maker |
| EGC exhaust gas pipes - inspect for exhaust gas leaks |
1 days |
inspect |
Maker |
| EGC system - check operation history; run at least 1 h/week |
1 weeks |
check |
Maker |
| EGC system incl. piping & auxiliaries - inspect for water leaks |
1 days |
inspect |
Maker |
| Electrical cabinets & frequency drives - filters, fans, terminals, PLC I/O, corrosion, seals |
6 months |
inspect |
Maker |
| Frequency drives - replace DC bus capacitors |
10 years |
replace |
Maker |
| Frequency drives - replace air filters |
1 years |
replace |
Maker |
| Gas analysis unit - check H2O correction |
1 years |
check |
Maker |
| Gas analysis unit - check pending messages |
1 weeks |
check |
Maker |
| Gas analysis unit - fan and air-outlet filter pads - check, clean/replace |
1 months |
check |
Maker |
| Gas analysis unit - leak tightness check |
6 months |
test |
Maker |
| Gas analysis unit - replace IR source and drying agent |
3 years |
replace |
Maker |
| Gas analysis unit - replace cell return valve and sample gas inlet filter |
2 years |
replace |
Maker |
| Gas analysis unit - replace sampling glass-fibre filter, seals and return valve; clean |
1 years |
replace |
Maker |
| Gas analysis unit - sampling glass-fibre filter & seals - check, clean/replace |
1 months |
check |
Maker |
| Gas analysis unit - system check |
1 months |
check |
Maker |
| Gas analysis unit heated sample line - check warm by hand |
1 days |
check |
Maker |
| Gas monitoring (G7000) - cabinet air conditioner - service |
2 years |
service |
Maker |
| Gas monitoring (G7000) - condensate pump - yearly maintenance |
1 years |
service |
Maker |
| Gas monitoring (G7000) - condensate switch - yearly maintenance |
1 years |
service |
Maker |
| Gas monitoring (G7000) - gas analyzer - service |
2 years |
service |
Maker |
| Gas monitoring (G7000) - gas pump - yearly maintenance |
1 years |
service |
Maker |
| Gas monitoring (G7000) - inspect filter, change if needed |
1 months |
inspect |
Maker |
| Gas monitoring (G7000) - multiplexer - yearly maintenance |
1 years |
service |
Maker |
| Gas monitoring (G7000) - probe - yearly maintenance |
1 years |
service |
Maker |
| Gas monitoring (G7000) - visual check of system for cleaning |
1 months |
inspect |
Maker |
| Level switches (1902, 1907) - function test with test actuator |
6 months |
test |
Maker |
| Level switches (1902, 1907) - inspect and clean internally |
1 years |
clean |
Maker |
| Main process & system parameters - check and log readings |
1 days |
check |
Maker |
| PLCs in electrical cabinets - replace battery |
4 years |
replace |
Maker |
| Temperature / level / pressure / flow transmitters - inspect leaks, corrosion, thermowells |
1 years |
inspect |
Maker |
| Uptake & by-pass damper valves - inspect internally via hatch |
1 years |
inspect |
Maker |
| Uptake & by-pass dampers - bearings - inspect / lubricate (2000 h) |
3 months |
lubricate |
Maker |
| Uptake & by-pass dampers - drive unit - check fastening (500 h) |
1 months |
check |
Maker |
| Uptake & by-pass dampers - drive unit - check supply lines and function (1000 h) |
1 months |
check |
Maker |
| Uptake & by-pass dampers - flexibles - inspect for leaks and damage |
1 months |
inspect |
Maker |
| Uptake & by-pass dampers - stuffing box - inspect / re-tighten (2000 h) |
3 months |
inspect |
Maker |
| Water analysis - PAH sensor & measuring chamber - visual check for cleaning |
1 weeks |
inspect |
Maker |
| Water analysis - PAH sensor - factory calibration |
2 years |
calibrate |
Maker |
| Water analysis - PAH sensor - internal light source replacement at factory |
4 years |
replace |
Maker |
| Water analysis - PAH sensor - validation |
6 months |
calibrate |
Maker |
| Water analysis - pH sensor & measuring chamber - visual check for cleaning |
1 weeks |
inspect |
Maker |
| Water analysis - pH sensor - replace electrode |
1 years |
replace |
Maker |
| Water analysis - pH sensor - validation |
3 months |
calibrate |
Maker |
| Water analysis - turbidity sensor - replace light source |
5 years |
replace |
Maker |
| Water analysis - turbidity sensor - validation |
3 months |
calibrate |
Maker |
| Water analysis - turbidity sensor measuring chamber - visual check for cleaning |
1 weeks |
inspect |
Maker |
| Water analyzer pump - inspect impeller, end cover and housing |
1 months |
inspect |
Maker |
| Water analyzer pump - replace impeller and end cover |
6 months |
replace |
Maker |
| Water analyzer pump - replace pump seal |
1 years |
replace |
Maker |
| Water monitoring - pressure holding/relief valve DHV712-R - function test |
6 months |
test |
Maker |
| Water monitoring - pressure reduction valve DMV755 - function test |
6 months |
test |
Maker |
| Water monitoring - water filter / strainer - visual check for cleaning |
1 weeks |
inspect |
Maker |